Saturday, January 25, 2014

Drywall Progress on the Basement Project

The drywall finishers have been hard at work.  Close to 1100 sq ft of space is being finished.  The basement is really coming together!

Bottom of the stairs (doors going to store-room and bathroom)





Stairway that is opened up.





Photo below taken from first bedroom (doors going out to main room and to the shared walk in closet).





Photo below taken looking into the first bedroom.





Photo below taken in the walk in closet.





Photos below taken in second bedroom.











Photo below taken from the big room (two open door ways go to the bedrooms).







Photo below of back wall in the basement that now has an extra entrance to the store room.



Photo below of an area of concrete that had to be removed to add pipes for a sink in a kitchen island.





Photo below of stairway and area where the kitchen will be.





Photos below of the big room.





Looking forward to continued progress!