Wednesday, November 25, 2015

Another finished basement!

In this basement there was previously one finished bedroom and the rest was unfinished.  The stairway divided the large open space into two smaller spaces although it was unfinished.  A beam was added under the stairs to allow them to "float" more, so that the stairs would not divide the spaces as much.  A full bathroom was added, as was another egress window, and small kitchenette.  Now the basement has three bedrooms, a full bath (divided into a toilet/shower room, and vanity room), family room with fireplace that is combined with a small kitchen/dining area, and a storage room.  In order to achieve that plumbing was moved, wiring/lighting added, insulation added, drywall and finishing was done, flooring was added, trim was put up, fireplace and surround tile added, and more was done.  If you're interested in having your basement finished or with any other project, contact Creekside Carpentry today!











Sunday, November 15, 2015

Outside Updates from the Back

It has been a long time since I have posted any updates on Rhett's projects.  He has completed quite a few.  As I get a chance to sift through pictures I will post them.  Hopefully they will inspire you on your projects.  If you are interested in having Creekside Carpentry do a job for you, feel free to call (574)518-2002.  We appreciate your business!





On this project he removed a back deck and added onto the master bedroom/bathroom/closet, upstairs living room, downstairs great room/cozy fireplace nook, downstairs bedrooms, storage room, and an upstairs sunroom with an amazing view.  He also reroofed everything and added a front porch and landscaping, redid interior flooring, updated the upstairs and downstairs kitchens and honestly I think I'm actually forgetting some items. It was a big project, but it turned out great.  Hopefully I can find some more photos!